The debugging skills of high-frequency tube making machine mainly include the following steps and precautions:
Preparation: Before debugging the high-frequency tube making machine, it is necessary to check the quality of the roller to ensure that the shape of the hole meets the design requirements and the bottom diameter size is correct.
Debugging steps:
Turn on the three-phase power main switch, turn on the power switch on the control box on the machine side, and preheat the vacuum tube and hot mold.
Insulate the lower mold, install the upper mold, debug the joint position of the upper and lower molds, adjust the four pillars of the lower and upper molds, and ensure horizontal alignment.
Adjust the three time controllers (fall time, welding time, cooling time) and flexibly apply these time parameters.
If it is the first time to adjust the mold, adjust the spacing of the synchronous tuning to the widest and start the operation test. If the effect is not ideal, gradually adjust the synchronous tuner until it meets the requirements.